Traffic Signal Study at McKinney and Milby, Cullen, and Telephone

  • Posted by East End District

Houston Public Works will be conducting a traffic study at the signalized intersections of McKinney at Milby, McKinney at Cullen, and McKinney at Telephone. The purpose of the study will be to analyze the the intersections’ conditions and determine the most adequate traffic control for them. This may include the permanent removal of the traffic signals at the conclusion of the study.

During the study period, the existing traffic signals will not be operational and instead, stop signs will be placed on selected approaches. Proper warning and regulatory signage will be in place at the intersections to properly inform roadway users of these temporary modifications.

Traffic data and patterns will be collected and analyzed during the test period beginning Friday, February 9, 2018 and lasting approximately 3-6 months. In case of any immediate negative findings, normal signalized control will be restored if determined that it is necessary.

If you have any questions or would like to discuss in more detail the scope of the study, please feel free to forward your comments to the Traffic Hotline at 832-395-3000 or traffic.hotline@houstontx.gov.